Can you lower your electricity bills while keeping the milk you produce at a high quality? Yes — through pre-cooling the milk and recovering heat from the cooling process. Margo offers a tube-in-tube pre-cooler and a heat exchanger, both made of stainless steel.

Up to -50% energy use Stainless steel, food-grade tube Free hot water 🇵🇱 Made in Poland 🏅 Gold Medal, International Trade Fair
Why It's Worth It

Lower Power Use, More Milk

Depending on the size of your dairy herd, you can save on electricity bills by pre-cooling the milk and recovering heat from the refrigerant. Warm milk heats the water — directly (pre-cooler) or indirectly (heat exchanger) — and reduces power use during cooling.

Margo recommends heat exchangers for farms producing around 500 liters of milk per collection and up. Medium and large farms can install both a tube-in-tube pre-cooler and a heat exchanger.

Published research results from the Institute of Technology and Life Sciences in Falenty, Poznań Branch, confirmed that implementing milk pre-cooling systems reduces energy use during milk cooling by around 50%.

~50%
less energy for cooling
6.5 kWh
savings per day
195 kWh
savings per month
2340 kWh
savings per year
Independent Research

Results from Selected Farms

Electricity use on dairy farms cooling milk — comparing traditional cooling to cooling with a pre-cooler, according to the Institute of Technology and Life Sciences, Poznań Branch.

Electricity consumption chart for dairy farms cooling milk
How It Works

How Does the Pre-Cooler Work?

The tube-in-tube pre-cooler is installed next to pipeline milking systems. It's a simple device made of two concentric tubes — milk flowing through the inner tube gives off heat to water flowing through the outer tube. The resulting warm water can be used to water the cows, wash equipment, or for heating.

Cold water flows in the opposite direction to the incoming warm milk. The unit is installed after the milk pump, directly above the milk tank — the pre-cooled milk then enters the cooler and is cooled further to the target temperature.

Diagram of how the tube-in-tube pre-cooler works
Diagram of the milk heat recovery system

Depending on the milk yield, units can be combined into larger systems. Once installed, the pre-cooler is maintenance-free — it's washed automatically by the milking system's wash cycle, and the acid-resistant steel build guarantees many years of trouble-free operation.

Limescale only starts forming above 60°C, and the water in the unit never reaches that temperature — so scale buildup isn't an issue in practice. Washing after each use is still recommended.

All Upside

Tube-in-Tube Pre-Cooler — Nothing But Benefits

✓Faster milk cooling
✓Higher milk quality
✓Fewer bacteria in the milk
✓Trouble-free — no servicing required
✓No scale buildup
✓Electricity savings
✓Durable, simple construction
✓Lower load on the tank's refrigeration unit
✓Easy, fast installation
✓Money savings
✓Option to install a smaller refrigeration unit on the tank
✓Free hot water — for watering cattle and washing equipment
Technical Data

Device Parameters

  • Initial milk temperature: 34°C
  • Milk temperature after the pre-cooler: 18–20°C
  • Initial water temperature: 10°C
  • Final water temperature: 16–20°C
  • Milk and water flow should be regulated with valves
  • Standard coil diameter: 120 cm
  • Recommended pre-cooler tube length: 24 m
Note — performance depends on:

Tube length and diameter (recommended pre-cooler length is 24 m) and the milk flow time — the longer the flow time, the faster the heat loss and the better the heat exchange.

Construction: stainless steel tube for water, food-grade stainless steel tube for milk. We manufacture tube sizes (mm): 22/34, 25/34, 28/40, 34/48, 40/54, 52/69.

Installation

Installation

Warm Milk Connection
Warm milk enters from above the pre-cooler, so it flows down by gravity.
Cold Water Connection
Cold water enters from below the pre-cooler, on the opposite side from the warm milk inlet.
Installation
We install it directly before the milk tank, after the milking unit — for example, suspended from the ceiling.
Cooling Process
The already pre-cooled milk then flows into the cooler.
Inlets and Outlets
Milk and water inlets/outlets — made to the customer's preference (smooth tube, hose barb, external thread or tri-clamp).
Mounting
Mounting lugs for hanging, or legs for floor standing.
Two Versions

We Manufacture the Tube-in-Tube in Two Versions

Margo tube-in-tube pre-cooler - enclosed version

Enclosed Version

Available at extra cost — stainless steel cladding

Margo tube-in-tube pre-cooler - open version

Open Version (Coil)

Standard version

Price List

Available Capacities and Prices

This product is offered in the variants below, depending on the amount of milk flowing per hour:

Milk Tube Diameter [mm]Water Tube Diameter [mm]Tube Length [m]Net Price
22, 25, 28, 344812PLN 5,808.00
22, 25, 28, 344818PLN 7,920.00
22, 25, 28, 344824PLN 9,600.00
34 or 416012PLN 6,390.00
34 or 416018PLN 8,710.00
34 or 416024PLN 10,560.00

Ask About the Tube-in-Tube Pre-Cooler

We'll help you choose the right capacity and version for your herd size.

Ask for a Price Call: +48 29 769 09 89

Search for products

Back to Top
Product has been added to your cart
Compare (0)